680
North Lake Shore Drive
Removed existing roofs and installed Koppers Industries Coal Tar
Pitch built up roof system on the dead level roof areas and 2045-M
on the sloped roof areas. |
|
|
Allerton
Hotel
Roof Tile Replacement (5,000 pcs.) on nineteen roof levels. Flat
roof replacement on ten levels with a Performance Permastic adhesive
adhered Derbicolor modified bitumen roof system. |
|
|
Chicago
Board of Education / Lane Tech
Roof removal and replacement with G.A.F. modified bitumen and G.A.F.
built up roofing systems. Repairs to slate roofs and custom fabricated
sheet metal. |
|
|
Chicago
Park District / North Avenue Beach
Installed new Tremco Burmastic roof system, concrete roof pavers
and custom fabricated sheet metal. |
|
|
Commonwealth
Edison
Roof removal and replacement with Sarnafil roof system and Westile
Pavers. |
|
|
Hyatt
Hotel McCormick Place
Installed new Carlisle Syntec fully adhered Brite Ply roof system
over flat and tapered insulation. Installed Hanover concrete roof
pavers on lower level roofs. Fabricated and installed all roof related
sheet metal. |

|
Lakeside
Technology Center
Installed Hyload W.S. Self-Adhered roof system; Johns Manville A.P.P.
granulated modified bitumen roof system; American Building Company
metal roof system. |
|
|
Meadows
of Glen Ellyn
Installed new Firestone 60 mil fully adhered E.P.D.M. roof system
over tapered insulation on sixteen roof areas; installed Petersen
Standing Seam metal roof system and gutters. |

|
Merchandise
Mart
Removed existing roof system and installed new insulation and modified
bitumen roof system on twenty-two roof areas. |
|
|
Midwest
Center for Green Technology
Sliplast Paradiene 20 T.G, Teranap R.I., Veral Flashing, root barrier,
drainage mat, filter fabric and growing media. |
|
|
Oak
Forest Hospital
Removed existing roofs and installed U.S. Intec modified bitumen
granule surfaced roof system. |
|
|
Oriental
Institute / The University of Chicago
Removal of existing tile and structural concrete slab deck. Installation
of steel deck, fireproofing, plywood and Ludowici tile with copper
gutters and cladding. |
|
|
Prudential
Plaza
Removed existing roofs and installed Siplast 20/30 modified bitumen
roof system on fourteen roof areas. |
|
First
United Methodist Church
Removed existing asbestos shingle tile roof. Replaced
the 12,000 square foot roof with ice and water shield, felt
underlayment, and synthetic Ecostar slate. |
|
|
Pulaski
Park
The replacement of aged tile and copper with custom color Ludowici
Tile to match the historic original color. Custom designed modified
bitumen with embossed tile profile to replicate a tile roof. All
new copper including masonry and carpentry repairs. |
1948
1996
|
Wrigley
Building
Originally
replaced by Knickerbocker Roofing in 1948, the coal tar roof
was removal and replaced with Performance Derbigum modified
bitumen
roof
system, Dow
insulation
and Wausau
roof
pavers.
|